Planning for an electric future
by Rolec13 November 20267 min read
Increasing demand for electricity across all sorts of waterfront facilities will put pressure on infrastructure if owners do not plan adequately for the future.
Expectations are changing across the whole spectrum of waterfront infrastructure. Although the fundamentals of services across marinas, harbours, ports, superyacht destinations, developments and boatyards haven’t really changed, the scale and sophistication of what is being asked for has.
For example, the fact that boats need power hasn’t changed. They are not (yet) capable of generating enough of their own sources of propulsion. However, power requirements are indeed growing, as is the importance of metering and energy management across all types of waterfront asset.
The role of electrification
The gradual electrification of marina and waterfront infrastructure is driving this trend. We are seeing more electric water taxis and smaller commercial craft particularly in Europe and the Middle East, while shore power and vessel electrification are becoming increasingly common for larger ports. It is of course still an emerging market, but it is worth thinking about how today’s electrical infrastructure will cope as more vessels become electrified and their power requirements increase.
Alongside having these kinds of conversations with customers in the UK, Europe, the Middle East and further afield, we are also seeing more interest in how electricity is measured and managed. With energy prices being as high as they are, accurate metering helps operators recover costs based on actual consumption and better understand where energy is being used. Remote and automated systems that reduce the need to manage everything manually are also increasingly popular.
Design is another consideration. Especially at premium marinas and new waterfront marinas, functionality is only part of the brief. Finishing, branding and how the equipment “fits” within its surroundings can also matter.
EV charging in marine environments
Just as there was much conversation about charging infrastructure for EVs as they became more common on land, so too is there growing conversation about EV charging in marine environments. However, demand is not necessarily coming from one type of user because of the range of charging needs in a marina.
Charging a smartphone, keeping a fridge cool or supplying power to a vessel - likely in multiple locations and all simultaneously - can put considerable pressure on existing electrical infrastructure. Visitors and berth holders need to charge, but so do staff and, increasingly, operational fleets. Waterfront sites are also quite different from typical car parks. Space can be constrained, demand can be seasonal, and existing electrical infrastructure may already be working hard.
At larger ports and operational sites, there are other things to think about. Commercial vehicles can't necessarily be parked and left to charge overnight, making charging speed and vehicle turnaround important. Operators may also want to understand energy consumption by individual vehicle or driver, particularly when trying to establish the real cost of running an electric fleet.
Then there is the question of what happens as the fleet grows. Planning for additional chargepoints can mean allowing enough electrical capacity for expansion, looking at distribution around the site and considering load management and software from the outset.
The waterfront environment itself matters too. Salt air, moisture and exposure to the elements all place demands on electrical equipment. On a busy operational site, reliability is particularly important because downtime can quickly become a problem. So rather than starting with “where can we put some chargepoints?”, a better question to ask would be what the site actually needs from its charging infrastructure, now and in the future.
Electrical infrastructure
Meeting higher power requirements is one thing, but having the electrical infrastructure to support them is another. The first step is understanding what power is available and what else is already using it. Vessel shore power, other marina services, buildings, hospitality, operational equipment and EV charging may all be drawing from the same site infrastructure, sometimes at the same time.
Load management can help by making better use of the power available and managing when different demands are drawing from it, while higher-power requirements can also mean more distribution equipment, cabling and, depending on the project, transformers or energy storage. And all of this needs to be carefully planned within the available space on a waterfront site.
Although shore power and other marina services have traditionally been planned separately from EV charging, as demand grows there is good reason to look at how they sit alongside the marina's other electrical loads, and eventually how generation and storage might fit into the same picture.
Marina demand is rarely constant because several vessels might connect to shore power while vehicles, buildings and other facilities are all drawing power of their own. Smarter energy management can help balance those demands against the capacity available, making better use of the site's existing infrastructure.
Battery storage and renewable generation may have a role to play for some sites. Locally generated energy can be stored for periods when demand is higher, offering greater flexibility where grid capacity is limited. Smart metering, charging management and energy management systems can also help operators see how much energy is being consumed, where it is going and when demand is highest.
How far a marina needs to go with any of this will depend on the site. Not every marina needs to become a self-sufficient microgrid. A small leisure marina has very different requirements from a superyacht destination or commercial port. Available power, and how that power is used as demand changes, will differ from site to site.
Designing infrastructure in from the outset
Electrical capacity, cable routes, distribution, access and space for equipment can determine what a marina or waterfront development is able to accommodate later, and problems arise when these things are considered only after the wider design has already been fixed. Adding capacity can mean going back into completed groundworks, finding new routes for cables or trying to accommodate equipment in spaces never intended for it. On an operational marina, that can also cause disruption to berths, parking and other areas.
There is a fairly simple principle here: when carrying out groundworks, think about what additional cabling or services the site might need in the future. Providing suitable routes and capacity for additional cabling during the initial works can make expansion much easier later. This doesn't mean installing technology before it is needed, it means making sensible allowances for what might come next.
Architects, master planners, marina consultants, mechanical, electrical and plumbing engineers, infrastructure specialists and operators all look at a development from different perspectives. Bringing those people together early gives the electrical requirements a place within the design rather than trying to squeeze them in afterwards.
Planning for what comes next
Power requirements are increasing and we are seeing more electric vessels, alongside greater interest in how energy is measured and managed. Standards and technologies will inevitably change along the way and that's exactly why it makes sense to leave some room for that change.
Marina infrastructure has a long working life but energy and electrification technology can move much faster. Designing solely around what a site needs today could make adapting it later unnecessarily difficult. Individual pieces of equipment will always matter but so will understanding how they fit together and how the site can adapt around them. Getting that right from the outset will make future changes much easier to manage.
For example, the fact that boats need power hasn’t changed. They are not (yet) capable of generating enough of their own sources of propulsion. However, power requirements are indeed growing, as is the importance of metering and energy management across all types of waterfront asset.
The role of electrification
The gradual electrification of marina and waterfront infrastructure is driving this trend. We are seeing more electric water taxis and smaller commercial craft particularly in Europe and the Middle East, while shore power and vessel electrification are becoming increasingly common for larger ports. It is of course still an emerging market, but it is worth thinking about how today’s electrical infrastructure will cope as more vessels become electrified and their power requirements increase.
Alongside having these kinds of conversations with customers in the UK, Europe, the Middle East and further afield, we are also seeing more interest in how electricity is measured and managed. With energy prices being as high as they are, accurate metering helps operators recover costs based on actual consumption and better understand where energy is being used. Remote and automated systems that reduce the need to manage everything manually are also increasingly popular.
Design is another consideration. Especially at premium marinas and new waterfront marinas, functionality is only part of the brief. Finishing, branding and how the equipment “fits” within its surroundings can also matter.
EV charging in marine environments
Just as there was much conversation about charging infrastructure for EVs as they became more common on land, so too is there growing conversation about EV charging in marine environments. However, demand is not necessarily coming from one type of user because of the range of charging needs in a marina.
Charging a smartphone, keeping a fridge cool or supplying power to a vessel - likely in multiple locations and all simultaneously - can put considerable pressure on existing electrical infrastructure. Visitors and berth holders need to charge, but so do staff and, increasingly, operational fleets. Waterfront sites are also quite different from typical car parks. Space can be constrained, demand can be seasonal, and existing electrical infrastructure may already be working hard.
At larger ports and operational sites, there are other things to think about. Commercial vehicles can't necessarily be parked and left to charge overnight, making charging speed and vehicle turnaround important. Operators may also want to understand energy consumption by individual vehicle or driver, particularly when trying to establish the real cost of running an electric fleet.
Then there is the question of what happens as the fleet grows. Planning for additional chargepoints can mean allowing enough electrical capacity for expansion, looking at distribution around the site and considering load management and software from the outset.
The waterfront environment itself matters too. Salt air, moisture and exposure to the elements all place demands on electrical equipment. On a busy operational site, reliability is particularly important because downtime can quickly become a problem. So rather than starting with “where can we put some chargepoints?”, a better question to ask would be what the site actually needs from its charging infrastructure, now and in the future.
Electrical infrastructure
Meeting higher power requirements is one thing, but having the electrical infrastructure to support them is another. The first step is understanding what power is available and what else is already using it. Vessel shore power, other marina services, buildings, hospitality, operational equipment and EV charging may all be drawing from the same site infrastructure, sometimes at the same time.
Load management can help by making better use of the power available and managing when different demands are drawing from it, while higher-power requirements can also mean more distribution equipment, cabling and, depending on the project, transformers or energy storage. And all of this needs to be carefully planned within the available space on a waterfront site.
Although shore power and other marina services have traditionally been planned separately from EV charging, as demand grows there is good reason to look at how they sit alongside the marina's other electrical loads, and eventually how generation and storage might fit into the same picture.
Marina demand is rarely constant because several vessels might connect to shore power while vehicles, buildings and other facilities are all drawing power of their own. Smarter energy management can help balance those demands against the capacity available, making better use of the site's existing infrastructure.
Battery storage and renewable generation may have a role to play for some sites. Locally generated energy can be stored for periods when demand is higher, offering greater flexibility where grid capacity is limited. Smart metering, charging management and energy management systems can also help operators see how much energy is being consumed, where it is going and when demand is highest.
How far a marina needs to go with any of this will depend on the site. Not every marina needs to become a self-sufficient microgrid. A small leisure marina has very different requirements from a superyacht destination or commercial port. Available power, and how that power is used as demand changes, will differ from site to site.
Designing infrastructure in from the outset
Electrical capacity, cable routes, distribution, access and space for equipment can determine what a marina or waterfront development is able to accommodate later, and problems arise when these things are considered only after the wider design has already been fixed. Adding capacity can mean going back into completed groundworks, finding new routes for cables or trying to accommodate equipment in spaces never intended for it. On an operational marina, that can also cause disruption to berths, parking and other areas.
There is a fairly simple principle here: when carrying out groundworks, think about what additional cabling or services the site might need in the future. Providing suitable routes and capacity for additional cabling during the initial works can make expansion much easier later. This doesn't mean installing technology before it is needed, it means making sensible allowances for what might come next.
Architects, master planners, marina consultants, mechanical, electrical and plumbing engineers, infrastructure specialists and operators all look at a development from different perspectives. Bringing those people together early gives the electrical requirements a place within the design rather than trying to squeeze them in afterwards.
Planning for what comes next
Power requirements are increasing and we are seeing more electric vessels, alongside greater interest in how energy is measured and managed. Standards and technologies will inevitably change along the way and that's exactly why it makes sense to leave some room for that change.
Marina infrastructure has a long working life but energy and electrification technology can move much faster. Designing solely around what a site needs today could make adapting it later unnecessarily difficult. Individual pieces of equipment will always matter but so will understanding how they fit together and how the site can adapt around them. Getting that right from the outset will make future changes much easier to manage.